Technical Program Manager, Data Center Construction Cost Estimator

Singapore Until 10/7/2026 5+ years exp First posted August 8, 2026 Last posted August 8, 2026
Job description

About the Job

In this role, you will own cost estimates, cost benchmarking, and the preconstruction commercial activities of new data centre builds. You will act as the point of contact between project team key stakeholders and the APAC Estimating teams as well as ensuring adequate support and budget for extended workforce project consultant estimators. You will work closely with Engineering, Construction, Procurement, and partner teams, ensuring all cost data developed and managed meets the requirements specific to each project’s needs. You will report directly to the EMEA/APAC Region Estimating Manager and work with the Strategic Estimating team to ensure alignment within Global Estimating.

The AI and Infrastructure team is redefining what’s possible. We empower Google customers with breakthrough capabilities and insights by delivering AI and Infrastructure at unparalleled scale, efficiency, reliability and velocity. Our customers include Googlers, Google Cloud customers, and billions of Google users worldwide.

We're the driving force behind Google's groundbreaking innovations, empowering the development of our cutting-edge AI models, delivering unparalleled computing power to global services, and providing the essential platforms that enable developers to build the future. From software to hardware our teams are shaping the future of world-leading hyperscale computing, with key teams working on the development of our TPUs, Vertex AI for Google Cloud, Google Global Networking, Data Center operations, systems research, and much more.

Responsibilities

  • Own cost estimates/cost plans, cost benchmarking, communications and manage meetings and deliverables as the point of contact between the project teams and the estimating team as well as ensuring adequate support and budget for project consultant (extended workforce) estimators.
  • Be responsible for the development, maintenance, and updates to all Data Center construction cost estimates for ongoing and new data center projects as well as providing data analytics regarding those estimates for the region.
  • Build trusted relationships with program stakeholders, including managing expectations of executive cross-functional leads and ensuring they have the insights they need to make effective decisions.

Qualifications

Minimum qualifications:

  • Bachelor’s degree or equivalent practical experience.
  • 5 years of experience in construction cost management activities and program management.
  • Experience creating infrastructure designs (e.g., telecom, electrical, mechanical), drawing sets for builds, and remodels of data center networking spaces.
  • Experience in pre-construction quantity surveying and cost estimating.
  • Experience in design processes, procurement, and work package planning.

Preferred qualifications:

  • RICS/SCSI/AIQS (or equivalent) chartered or affiliated.
  • Experience in managing vendor relationships, with a demonstrated understanding of standard practices in the design and construction industry.
  • Experience in the commercial side of hyper-scale data center builds working for a General Contractor (GC)/Mechanical, Electrical, and Plumbing (MEP) contractor, Consultant or end-user/client/developer side.

Additional Information

Google will be prioritizing applicants who have a current right to work in Singapore, and do not require Google's sponsorship of a visa.

About this role

Summary

Manage cost estimates and benchmarking for data center construction projects.

Job title

Technical Program Manager, Data Center Construction Cost Estimator

Experience level

5+ years

Minimum experience

5+ years exp

Industry

technology

Location requirements

Singapore-based role, remote work not specified

Salary

Not specified

Management role

No

Skills & keywords

Required skills

cost managementconstructiondata centerpre-constructioncost estimating

Preferred skills

vendor managementhyper-scale data centersdesign processesprocurementwork package planning

Specializations

cost managementconstructiondata centerpre-constructionestimation
Locations

Structured locations inferred from the posting.

Singapore

Work arrangement unknown Country