Senior Regional Construction Scheduler

Droisys Inc

Apply to this job
Los Angeles, CA Until 9/30/2026 10+ years exp H-1B sponsor history First posted August 1, 2026 Last posted August 1, 2026
Job description

Title: Senior Regional Construction Scheduler
Office Location: Los Angeles, CA
Work Location: In Office
Terms: Long Term

Duties:

  • Report directly to the Senior Construction Manager of Scheduling and Estimating. Provide various schedule-related reports for upper management to meet Key Performance Milestones.
  • Assist in the supervision of Project Schedulers to ensure project timelines are met and interface with OARs, Senior Project Managers and other site staff related to the review of CPM schedules.
  • Independently interpret and read detailed construction drawings (Architectural, Structural, Mechanical, Electrical, Plumbing, Civil, etc.) and develop a clear understanding of work scope.
  • Review Contractor P6 initial Baseline Construction Schedules and identify any missing scope, identify any missing logic or milestones, identify and analyze the critical path, review the required cost loading, and be able to provide written technical schedule review comments based on the district’s structured review templates.
  • Review multiple Contractor P6 Monthly schedule updates and provide written schedule review comments that document milestone schedule slippage, critical path activity slippage, and provide over-all schedule analysis based on the District’s structured review templates.
  • Perform schedule Time Impact Analysis by using the method of Windows Analysis while incorporating either contemporaneous and/or forensic schedule parameters in a detailed write-up.
  • Read drawings to determine if work is in or out of scope and understand terms and conditions of the contract to determine if any compensable or non-compensable time extensions have merit.
  • Effectively communicate with the project team regarding any schedule/progress related issues or concerns at regular schedule meetings.
  • Develop, maintain, and update various program schedules identifying relationships, logic, milestones, and constraints for construction projects.
  • Perform status updates for Program Schedules/Master Schedules on a regular basis.
  • Ensure proper use of Program-level standard codes, layouts and reports necessary to ensure data integrity
  • Prepare reports as needed and directed by Senior Management.
  • Visit construction sites and attend meetings, as needed, and check the Contractor’s monthly schedule progress.

Minimum Required Experience:

  • Minimum ten (10) years full time paid professional experience in Construction Scheduling for an Owner or General Contractor, preferably in an educational facility or public works projects.
  • Proficiency in Primavera Latest Version (P6 v19) and MS Office Suite

Required Education:

  • Graduation from a recognized college or university with a bachelor’s degree in engineering, architecture, construction management, or any related field.

OR

  • Graduation from a recognized college or university with a bachelor’s degree in any course, but with additional two (4) years of experience in the duties above to compensate for the required education.

Required Skills:

  • Excellent written and verbal communication skills
  • Superior organizational and planning skills
  • Ability to build efficient working relationships with project teams and department staff
  • Understanding of theories, principles and practices of cost engineering, scheduling and schedule forensics

About this role

Summary

Develop, review, and analyze construction schedules, reports, and progress to meet project milestones.

Job title

Senior Regional Construction Scheduler

Experience level

10+ years

Minimum experience

10+ years exp

Industry

construction

Location requirements

On-site in Los Angeles, CA; no remote allowed.

Salary

Not specified

Visa sponsorship

H-1B sponsor history

Management role

No

Skills & keywords

Required skills

communicationorganizationforensicscost engineeringreview

Preferred skills

None specified

Specializations

scheduling CPM construction project planning P6
Locations

Structured locations inferred from the posting.

Los Angeles, CA, USA

On-site City