Project Control Analyst

Veoliaenvironnementsa

Apply to this job
Bengaluru, KA, in on site Until 9/30/2026 7+ years exp H-1B sponsor history First posted August 1, 2026 Last posted August 1, 2026
Job description

About Veolia

Veolia group aims to be the benchmark company for ecological transformation. In 2022, with nearly 220,000 employees worldwide, the Group designs and provides game-changing solutions that are both useful and practical for water, waste and energy management. Through its three complementary business activities, Veolia helps to develop access to resources, preserve available resources, and replenish them. In 2021, the Veolia group supplied 79 million people with drinking water and 61 million people with wastewater service, produced nearly 48 million megawatt hours of energy and treated 48 million metric tons of waste. Veolia Environnement (Paris Euronext: VIE) generated consolidated revenue of €28.508 billion in 2021. www.veolia.com

Job  Summary

The Planner/Scheduler specializes in using Primavera P6 for scheduling. The PCA takes charge of managing SAP. For smaller projects, the PCA is a multi-tasker, handling both P6 scheduling and SAP tasks like closing WBS, Project Progress reports , invoicing clients, and maintaining project schedules.

He also creates and maintains the schedule using input from various departments and the Project Manager. They monitor and control project activities in collaboration with the Project Manager and stakeholders.

○Typically involved in large or complex projects.

○Uses scheduling tool: Primavera P6.

Essential Responsibilities / Expectations

 

Tasks During Planning Phase:

  • Develop the initial project schedule based on the contract and kickoff meeting discussions.
  • Identify contractual milestones and dependencies between stakeholders.
  • Identify the critical path and total float.
  • Freeze the project schedule during the Project Planning Set Up meeting.

Schedule Updates During Execution Stage:

  • Conduct regular project schedule reviews with project stakeholders.
  • Update the schedule based on progress reports and decisions from project reviews.
  • Track progress of tasks and update the baseline as needed.
  • Document all project changes (e.g., change orders, staff changes, delays) for future reference.

Closing Phase:

  • Update the final schedule to reflect the actual project execution (as-built data).

  • Information Included in the Schedule:

    • The specific information included in the project schedule depends on contractual obligations and internal agreements. However, some key elements typically include:

    • Project milestones (start date, completion dates, etc.)

    • Project management milestones, Engineering deliverables Procurement activities (RFQs, POs, vendor deliverables)

  • Civil work completion and permitting

  • Installation activities

  • Commissioning activities

  • Closeout activities (trial operation, handover)

Bachelor of Engineering (BE)

Highly experienced Primavera P6 professional with 7–10 years of hands-on implementation, administration, and enterprise project controls experience. 

As an inclusive company, Veolia is committed to diversity and gives equal consideration to all applications, without discrimination.

About this role

Summary

Manage project schedules using Primavera P6 and SAP, monitor progress, update baselines, and document changes.

Job title

Project Control Analyst

Experience level

7-10 years

Minimum experience

7+ years exp

Industry

environmental services

Location requirements

Bengaluru, remote allowed

Salary

Not specified

Visa sponsorship

H-1B sponsor history

Management role

No

Skills & keywords

Required skills

Primavera P6SAPproject schedulingproject management

Preferred skills

None specified

Specializations

Primavera P6SAPproject schedulingproject management
Locations

Structured locations inferred from the posting.

Bengaluru, Karnataka, India

Hybrid City