Production Technician II - Instrumentation & Controls

Jobs.nexteraenergy.com

Apply to this job
Until 9/8/2026 First posted May 29, 2026 Last posted July 10, 2026
Job description

Requisition ID:  94626 

Florida Power & Light Company is the largest electric utility in the U.S., providing reliable energy to nearly 12 million Floridians. With one of the nation’s most fuel-efficient, cost-effective power generation fleets and industry-leading reliability, we’re redefining what’s possible in energy. Want to be part of something powerful? Join our outstanding team and help shape the future of energy.

 

Position Specific Description

This position sits within the Power Generation Division which is responsible for all NextEra Energy's non-nuclear generation operations. This is a multi-craft position that operates and maintains plant equipment. The plant is located in Pensacola, Florida.  Preferred craft is Instrumentation and Controls. 

About this role

Summary

Operate and maintain plant equipment, specializing in instrumentation and controls in power generation.

Job title

Production Technician II - Instrumentation & Controls

Experience level

null

Industry

energy

Location requirements

must be in Pensacola, Florida, or remote work allowed

Salary

Not specified

Management role

No

Skills & keywords

Required skills

instrumentationcontrols

Preferred skills

None specified

Specializations

instrumentationcontrols
Locations

Structured locations inferred from the posting.

Pensacola, FL, USA

Remote City