FPSO HU Manager

Nantong, Jiangsu, cn on site Until 8/24/2026 20+ years exp First posted June 25, 2026 Last posted June 25, 2026
Job description

The Suriname Block 58 development is a major deepwater offshore project led by our client, involving the installation and start-up of a new Floating Production Storage and Offloading (FPSO) unit and subsea production system. The project aims to deliver safe, efficient hydrocarbon production while minimizing environmental impact and reducing flaring and greenhouse gas emissions.

The FPSO HU Manager will play a key role during the execution phase, supporting the FPSO Package Manager in preparing the field for operations from Final Investment Decision (FID) through commissioning and start-up. The role involves close coordination with engineering, procurement, construction, installation, and operations teams to ensure the FPSO and subsea systems are safely integrated and ready for production.

  • Support the FPSO Package Manager in the overall management of the FPSO package during execution.
  • Enforce the Company’s HSE culture with contractors and subcontractors during construction, integration, and commissioning phases.
  • Monitor cost control and schedule performance for the FPSO package.
  • Manage contract compliance, including change management, variation orders, and deliverables follow-up.
  • Lead planning and execution of hook-up, pre-commissioning, commissioning, and start-up activities.
  • Coordinate interfaces between the FPSO and other project packages, including subsea and field operations teams.
  • Ensure a smooth transition from project execution (EPSCC) to operations and maintenance (O&M).
  • Review technical documentation including operating philosophy, operating manuals, maintenance procedures, and SIMOPS dossiers.
  • Follow procurement and readiness of operational spare parts.
  • Support development of commissioning strategy and field operations organization.
  • Monitor contractor progress at fabrication yards and ensure alignment with the project integrated schedule.
  • Supervise risk management activities and support project control functions.
  • Ensure proper reporting to project management and manage potential claims, change orders, and contractual issues.
  • Contribute to lessons learned and project close-out documentation.
  • Minimum 20 years of experience in the Oil & Gas industry.
  • Proven experience in major offshore deepwater developments.
  • Strong experience with FPSO projects, particularly hook-up, commissioning, and start-up phases.
  • Experience with subsea production systems integration.
  • Background in mechanical, petroleum, or industrial engineering (Master’s degree or equivalent preferred).
  • Strong contract management and negotiation skills with contractors and suppliers.
  • Demonstrated ability to manage cost optimization and project performance.
  • Excellent communication and stakeholder management skills within multidisciplinary teams.
  • Ability to work autonomously with a proactive and solution-oriented mindset.
  • Willingness to travel to shipyards in Europe, China, and Suriname.
  • English required, French preferred.

Start: Asap

Duration : 1 Year renewable

Location : COSCO‐ CHINA yard

About this role

Summary

Manage FPSO project execution phases; coordinate engineering, procurement, commissioning, and start-up.

Job title

FPSO HU Manager

Experience level

20+ years

Minimum experience

20+ years exp

Industry

oil & gas

Location requirements

Nantong, Jiangsu, China; remote not allowed

Salary

Not specified

Management role

Yes

Skills & keywords

Required skills

offshoreFPSOcontract managementproject managementdeepwater

Preferred skills

Frenchstakeholder management

Specializations

offshoreFPSOdeepwaterproject managementmarine engineering
Locations

Structured locations inferred from the posting.

Nantong, Jiangsu, China

On-site City