ACMV Engineer x4 (Data Centre/Construction/MNC)
Talent Trader Group
Apply to this jobKey Responsibilities:
- Design and implement ACMV systems for data centres.
- Conduct load calculations and optimize cooling efficiency.
- Oversee installation, testing, and commissioning.
- Monitor performance, troubleshoot issues, and ensure compliance.
- Prepare technical reports and risk assessments.
- Ensure safety, quality control, and regulatory compliance.
- Support maintenance and post-handover operations.
Requirements
- Degree in Mechanical or Building Services Engineering.
- At least 2 years working experience in ACMV/HVAC engineering.
- Experience in CRAC/CRAH, chilled water, DX cooling, and airflow management.
- Strong problem-solving and project management skills.
Interested candidates who wish to apply for the advertised position, please click 'APPLY' to submit your application or send in your resume to [email protected]
EA License No: 13C6305
Reg. No.: R1874608
For candidate who applied for the advertised position is deemed to have consented to us that we may collect, use or disclose your personal information for purpose in connection with the services provided by us.
Summary
Designs, implements, and oversees ACMV systems for data centres ensuring performance and compliance.
Job title
ACMV Engineer x4 (Data Centre/Construction/MNC)
Experience level
2+ years
Minimum experience
2+ years exp
Industry
construction
Location requirements
Johor Bahru, Malaysia, on-site, no remote work
Salary
Not specified
Management role
No
Required skills
Preferred skills
Specializations
Structured locations inferred from the posting.
Johor Bahru, Johor, Malaysia